PennDOT Maintenance Work Schedule for Potter County, April 9, 2012 – April 13, 2012
1 min readPotter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of April 9 – April 13, weather permitting.
Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
Potter County 0260:
Sign Crew: 04
• State Route: Various, Repair/Replacement throughout the County
Coudersport: 83
• State Route: Various, Bridge Cleaning in and around Coudersport Area
• State Route: 3015, Ditch Cleaning
Bridge Crew: 06
● State Route: 3013, Abutment Repair
Coneville: 33/84
● State Route: 44, 244, Slide Repair
• State Route: 4021, Shoulder Stabilization
• State Route: 4014, Brushing
Ulysses: 34/36
● State Route: 1015, Tail Ditching
• State Route: 244, Brushing
Galeton: 41/42
• State Route: 2002, Shoulder Restoration
Keating Summit: 31/44
• State Route: Various, Bridge Cleaning in and Around the Austin Area
• State Route: 872, Install Under- Drain
Cameron County 0240:
• State Route: 155, 120 Bridge Cleaning
• State Route: 3001, Pipe Replacement
The following work is scheduled to be completed by contractor, weather permitting:
• Dolomite: State Route 44, Shinglehouse, Bridge Repair (approx end 7/13)
• L.C.Whitford: State Route 49, Harrison TWP, Bridge Deck Replacement, One
Lane Restriction, Temporary Signals in Place
For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us
PennDOT reminds motorists they can also log on to 511pa.com or call 511 from any phone to check traffic conditions before heading out.
Source: PENNDOTPotter County Maintenance
Coudersport, PA
(814) 274-9181