Sat. Dec 21st, 2024

Coudy News

Late Breaking News for Coudersport and Northcentral PA

Bridge Work to begin on Pusher Siding Road, July 19

1 min read

Clearfield –Work to repair a bridge on Route 1009 (Pusher Siding Road) in Potter County will begin on Tuesday, July 19. The bridge spans Ludington Run in Ulysses Township, two miles north of the village of Newfield. Through August 31, crews from PennDOT Potter County Maintenance will be working replace the deck and beams of the existing bridge. All work is weather dependent.

With Route 1009 closed, a detour using Routes 49 and 1011 Ulysses-Hickox Road) will be in place. Signage will be in place to alert drivers to the closure.

The current bridge was built in 1980 and carries average daily traffic of 130 vehicles. The bridge is currently posted for 8 tons for single vehicles and 11 tons for combination vehicles. This repair work will allow PennDOT to remove the posting.

PennDOT advises drivers to obey posted speed limits and follow all official detour signs. For more information on roadway construction and maintenance operations, visit PennDOT’s website at www.dot.state.pa.us.

Follow PennDOT on Twitter at www.twitter.com/511PAStateCOLL.

Leave a Reply

Your email address will not be published.

Copyright © All rights reserved. | Newsphere by AF themes.