PennDOT Maintenance Work Schedule for Potter County, April 2, 2012 – April 6, 2012
1 min readPotter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of April 2 – April 6, weather permitting.
Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
Potter County 0260:
Sign Crew: 04
• State Route: Various, Repair/Replacement throughout the County
Bridge Crew: 06
● State Route: 3001, Box Culvert (Wild Boy Run)
Coneville: 33/84
● State Route: 4021, 4014, Shoulder Stabilization
Ulysses: 34
● State Route: 1015, Ditch Cleaning
Galeton: 41/42
• State Route: 2002, Shoulder Restoration
Keating Summit: 31/44
• State Route: 872, Install Under- Drain
Cameron County 0240:
• State Route: 46, 120 Bridge Cleaning
• State Route: 3001, Pipe Replacement
The following work is scheduled to be completed by contractor, weather permitting:
• Dolomite: State Route 44, Shinglehouse, Bridge Repair (approx end 7/13)
• L.C.Whitford: State Route 49, Harrison TWP, Bridge Deck Replacement, One Lane Restriction, Temporary Signals in Place
For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us.
PennDOT reminds motorists they can also log on to 511pa.com or call 511 from any phone to check traffic conditions before heading out.