PennDOT Maintenance Work Schedule for Potter County April 25-April 29
1 min readPotter /Cameron PENNDOT – Potter/Cameron County Maintenance announces the following work schedule for the week of April 25 through April 29, weather permitting.
Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
Potter County 0260:
Sign Crew:
- Various Routes – Resetting signs throughout the county
Bridge Crew:
- Various Routes – Bridge Repairs
Coneville Crew:
- State Route: 44 – Patching
Coudersport Crew:
- State Route: 49 – Patching – Monday
- State Route: 44 – Slide Removal – Tuesday
- State Route: 3015 – Washout Repair – Wednesday to Friday
Ulysses/Genesee Crew:
- Various Routes: Bridge Flushing
- State Route: 1015 – Grade Road
Galeton/Germania Crew:
- State Route: 2002 – Patching
Keating Summit Crew:
- State Route: 3001 – Repair Washouts & Brush Removal – Monday & Tuesday
- State Route: 0607 – Slide Removal – Wednesday to Friday
Cameron County 0240:
- State Route: 120 – Ditch Cleaning
- State Route: 120 – Brush removal
- Various Routes: Sweeping
The following work is scheduled to be completed by contractor, weather permitting:
- Asplundh: State Route 872, Potter County, Tree Trimming
- Glenn O. Hawbaker: State Route 872, Potter County, Bridge Repair
- Glenn O. Hawbaker: T-530 (Clara Road), Bridge Repair –Detour in Place
- Swank Contracting: State Route 120, Cameron County, Bridge Repair
For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us.
PennDOT reminds motorists they can also log on to 511pa.com or call 511 from any phone to check traffic conditions before heading out.
Source: PENNDOT Potter County Maintenance