Mon. Dec 23rd, 2024

Coudy News

Late Breaking News for Coudersport and Northcentral PA

PennDOT Maintenance Work Schedule for Potter County May 30 – June 3

1 min read

Potter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of May 30 through June 3, weather permitting.

Motorists should travel with extra caution in these and all work areas.  Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.

Potter County 0260:

Sign Crew: 04

Various Routes – Resetting/Replacing, signs throughout the county

Bridge Crew: 06

●    State Route:  1005, Phoenix Run Road – Bridge Deck Repair

Pipe Replacement: 33

●    State Route:  4021, Honeoye Road – Pipe Replacement

4014, Plank Road – Pipe Replacement

Tail Ditching: 34

●    State Route:  44 – Ditching

Shoulder Cutting: 44, 41

•    State Route: 44/1005 – Phoenix Run Road, shoulder cutting & inlet cleaning

East Patching, Shoulder Stabilization: 42

•    State Route:  49 – Colesburg to Gold – Patching

West Patching, Shoulder Stabilization: 31

●    State Route:  4023 – Eleven Mile Road, patching

Cameron County 0240:

●   State Route:  120, side dozing

●   State Route:  2001, shoulder repairs

•   State Route:  Various Routes – Mowing

The following work is scheduled to be completed by contractor, weather permitting:

  • Glenn O. Hawbaker: State Route 872, Potter County, Bridge Repair
  • Glenn O. Hawbaker:  T-530 (Clara Road), Bridge Repair –Detour in Place
  • Swank Contracting:  State Route 120, Cameron County, Bridge Repair

For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us.

PennDOT reminds motorists they can also log on to 511pa.com or call 511 from any phone to check traffic conditions before heading out.

Leave a Reply

Your email address will not be published.

Copyright © All rights reserved. | Newsphere by AF themes.