PennDOT Maintenance Work Schedule for Week of April 18 – 22
1 min readPotter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of April 18 through April 22, weather permitting.
Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
Potter County 0260:
Sign Crews
- Various Routes – Resetting signs throughout the county
Bridge Crew:
- State Route: 3015- Bridge Guiderail Repair
Coneville Crew:
- State Route: 44 – Patching
Coudersport Crew
- State Route: 49 – Patching – Monday
- State Route: 3015 – Repairing Washouts – Tuesday & Wednesday
- State Route: 44 – Road Maintenance – Thursday & Friday
Ulysses/Genesee Crew
- Various Routes- Bridge Flushing
Galeton/Germania Crew
- Various Routes – Bridge Flushing
Keating Summit Crew:
- State Route: 607 – Guiderail Repair – Monday-Wednesday
- State Route: 3001 – Repairing Washouts – Thursday & Friday
Cameron County 0240:
- State Route: 0120 – Ditch Cleaning
- State Route: 0120 & 0046 – Brushing
The following work is scheduled to be completed by contractor, weather permitting:
- Asplundh: State Route 872, Potter County, Tree Trimming
- Glenn O. Hawbaker: State Route 872, Potter County, Bridge Repair
- Swank Contracting: State Route 120, Cameron County, Bridge Repair
For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us.
PennDOT reminds motorists they can also log on to 511pa.com or call 511 from any phone to check traffic conditions before heading out.
Source: PENNDOT Potter County Maintenance